Archive for June, 1993
G + H McGill
Starting in June, in partnership with McGill’s Insulation, we are pleased to reveal that we shall be Senior H.V.A.C. Project Engineers for the Dunbar oil rig development project at Clydebank Shipbuilding & Engineering Works.
![]()
Representing G+H Mcgill limited — consulting engineers, designers, manufacturers & contractors for insulation of Hadleigh, England and part of the G + H Montage Group — we shall be responsible for the project in all respects, including: contract variations, document control to B.S. 5750, liaison with U.i.E. Shipbuilding (Scotland) Limited, and Total Oil Marine Limited, materials procurement, personnel management, planning and programming, pre-commissioning, and pressure / leakage testing to the satisfaction of Bureau Veritas.
1993-12 Edit: We carried out this role very successfully until October 1993, and received a written commendation for our contribution.
Links:
Extra words (search feature): ductwork, ducting, ducts, flanges, risers, offsets, grilles, diffusers, fans, AHU, A.H.U., installation, erection, fitting, combing, bulkhead, topsides, deck, jacket, ventilation, extract, supply, make-up, smoke removal, toilet extract, kitchen canopy, hood, filters, commissioning, pressure leakage testing, project management, client, supplier & workforce liaison, programming & scheduling, site measurement, x1375, roevin, Bill Campbell, Tom Donovan, Stewart Traquair.
June 14, 1993
![[Picture of Bureau Veritas logo]](http://dcdevine.files.wordpress.com/2006/09/bureauveritas.gif?w=70&h=93)
![[Picture of Total Oil Logo]](http://dcdevine.files.wordpress.com/2006/10/total1.jpg)